RAINIER SQUARE TOWER
GC Lease Crutcher Lewis
ELECTRICAL VALUE $27,000,000
PROJECT SIZE 1,676,746 SF
ARCHITECT NBBJ
ENGINEER GERBER ENGINEERING
DESCRIPTION
PRIME’s electrical work for the Residential Tower at Rainier Square will include busway distribution, branch, lighting, lighting controls, tele/ data rough in, CCTV rough in, and fire alarm for an approximate value of $7.8 million. Prefab will be utilized throughout the project to reduce onsite waste and increase productivity by completing some of the tedious/ repetitive, time consuming tasks, in a controlled environment. The residential portion of the tower has a staggered schedule time of roughly 12 months between the S&C and TI buildout.
![SCCA Building H V2](https://www.primee.com/wp-content/uploads/2022/06/SCCA-Building-H-V2.jpg)
SCCA BUILDING H
GC GLY CONSTRUCTION
ELECTRICAL VALUE $16,000,000
PROJECT SIZE 200,000 SF
ARCHITECT ZGF
ENGINEER AEI
DESCRIPTION
![2A89A418 DB6A 4AA5 8F6E FD7F1C51F78A](https://www.primee.com/wp-content/uploads/2022/06/2A89A418-DB6A-4AA5-8F6E-FD7F1C51F78A.jpeg)
SEATTLE CHILDREN’s BUILDING CURE
GC Lease Crutcher Lewis
ELECTRICAL VALUE $34,000,000
PROJECT SIZE 531,000 SF
ARCHITECT AEDAS + FLAD ARCHITECTS
ENGINEER AEI